All lanes on M8 to close this weekend for footbridge refurbishments

All 16 lanes of the M8 will be closed during this weekend, starting from 6pm on Saturday until 1pm on Sunday.

All lanes on M8 to close this weekend for footbridge refurbishmentsGoogle Maps

All 16 lanes on Scotland’s busiest motorway are to close this weekend due to footbridge works.

The M8 was closed in both directions overnight in Glasgow between Junctions 19 (Anderston) and 24 (Helen Street) last weekend and will be closed on November 14 and 15.

This is to allow for the work to take place on the Cornwall Street and Kirkwood Street footbridges that span the M8 between Junction 21 (Seaward Street) and Junction 23 (Dumbreck), to the south-west of Glasgow City Centre.

All 16 lanes of the M8 will be closed during this weekend, starting from 6pm on Saturday until 1pm on Sunday.

The M8 eastbound will be closed between Junctions 24 and 22, including the Helen Street eastbound on-slip road. 

Traffic will be diverted via Helen Street, Edmiston Drive, Paisley Road West, Paisley Road, Kingston Street, Commerce Street, Broomielaw, and the A804, before joining the M8 eastbound at Junction 19. 

Traffic affected by an M8 Junction 23 eastbound on-slip road closure will join this diversion at Edmiston Drive and follow the same route to Junction 19.

For the M8 westbound closure between Junctions 20 and 24 will be diverted via West Street, Morrison Street, Paisley Road, and Paisley Road West.

From here, traffic travelling towards the M77 southbound will continue via Dumbreck Road to join the M77 at Junction 1, while traffic travelling towards the M8 westbound will continue via Helen Street to join the M8 at Junction 24.

The Seaward Street on-slip road will be closed, with traffic diverted via Seaward Street and Paisley Road West. From here, M77 southbound traffic will travel via Dumbreck Road to join the M77 at Junction 1, while M8 eastbound traffic will travel via Helen Street to join the M8 at Junction 24.

The Waterloo Street on-slip road will be closed with traffic diverted via Pitt Street, St Vincent Street, and Newton Street to the M8 at Junction 19, before continuing via West Street, Morrison Street, Paisley Road, and Paisley Road West. M77 southbound traffic will then travel via Dumbreck Road to join the M77 at Junction 1, while M8 eastbound traffic will travel via Helen Street to join the M8 at Junction 24.

The Stobcross on-slip road will be closed with traffic diverted via Argyle Street, James Watt Street, Broomielaw, Bridge Street, Nelson Street, Morrison Street, Paisley Road, and Paisley Road West. M77 southbound traffic will then travel via Dumbreck Road to join the M77 at Junction 1, while M8 eastbound traffic will travel via Helen Street to join the M8 at Junction 24.

Road users are advised to avoid travel through the location and should plan ahead, consider alternative routes and modes of transport, and allow additional time to complete any journeys.

Amey, which is carrying out the works on behalf of Transport Scotland, has warned that during similar closures in 2024, delays of up to one hour were experienced, and comparable delays are possible if traffic levels are not significantly reduced.

It added that the operation requires large cranes and specialist heavy lifting equipment and can only proceed in suitable weather conditions.

Should adverse weather make it unsafe to proceed, the works may be postponed or rescheduled at short notice.

STV News is now on WhatsApp

Get all the latest news from around the country

Follow STV News
Follow STV News on WhatsApp

Scan the QR code on your mobile device for all the latest news from around the country

WhatsApp channel QR Code
Posted in

Today's Top Stories

Popular Videos

Latest in Glasgow & West

Trending Now