Plans for the first solar energy farm in the Western Isles have been abandoned.
The proposal for 25,000 solar panels to cover 11 acres of the Arnish Moor, three miles outside Stornoway, had been agreed in principal.
Gary Shepherd, of Surrey-based NGN Telecoms, wanted to build the five megawatt energy scheme in a 32-acre natural hollow in the moorland.
He has now told island firms who were due to carry out work for him that the project has been cancelled because of delays and government cutbacks.
The scheme had received preliminary approval and a public consultation was due to be held before a formal planning application was lodged.
Lewis architect Philip Mclean says he was not paid for planning work he carried out and has been left £1500 out of pocket.
The developer has previously said that the solar energy would power the Arnish industrial estate and Creed business park.
The site was specifically chosen because it sits in a natural basin and is located away from any residual developments, on ground which has no crofting potential or rights as the ground is too poor quality to sustain even grazing for livestock.
In this section
-
Fears planned turbines could pose problems for golden eagle population
- Northern police 'concerned' for wellbeing of missing 13-year-old boy
-
Temperatures continue to rocket as Scotland basks in fourth day of sunshine
- Study into ways to keep buzzards from preying on game birds welcomed
- Two ministers quit Church of Scotland in protest over gay clergy
- Baby pine marten recovering after falling from tree and injuring back
- Chips go viral: How a nine-year-old girl made school dinners a hot topic
-
Seven rescued after boat goes adrift ‘without enough lifejackets’
-
Summer here to stay as temperatures soar to another record high
- Islands windfarm to generate £20m for community over next two decades



Want to leave a comment? Please sign in.